
Contractor : Balfour-Beatty
Competion date: June 2010
Work to be preformed:
The 4 Judges Benches, Jury Box and Gallery rails in the District and County Court rooms are of plain sliced American Cherry with Light Emperador Marble caps and Varia Linea Ivory 3Form resin accent panels. A painted accent band of sculptured MDF wall panel with a crown and sub crown trim perimeters all court rooms along with the third floor mezzanine bulkhead.
Contractor: Yates Construction
Completion Date: June 2010
Work to be preformed:
As you walk down “ Main Street”, what they call the central corridor of this facility, you’ll find medium stained Plain Sliced Maple Wainscot with a maple chair rail and full height maple column surrounds. Other areas with the same compliments would be the Hall of Honor, the circular reception area with full height wall panels and columns, along with the Pre-Function and dining room column surrounds. There are various finishes of stained maple and plastic laminate casework in the fitness, medical, administration, and entertainment areas of the facility.
Contractor: SE&K Construction
Completion Date: January 2012
Work to be preformed:
Cherry wood in the Deans suite, lecture hall, seminar rooms, reception desk, and misc trim.
View more of this project here